Another happily ever after story from a satisfied First Finishers’ customer ~

“After a toilet leak from the upstairs master bathroom caused damage to the subfloor and ceiling, we had to hire a contractor to fix the problem.  Since there was a hole in the ceiling and everything was tore up, we decided to not just have it fixed but updated as well.  We called five different contractors, out of the five, four showed up, three on time.  Just on first impressions alone, First Finishers won hands down with timeliness, professionalism, and overall good gut feeling.

We knew we wanted to take out the garden tub, expand the shower, improve storage, and use tile on the floors, shower and wainscot the walls.  Kai had great ideas such as relocating the toilet and using the previous toilet space as storage.  John, the designer who helped us out with the custom cabinet and the tile choices was right on point.  Matt, the tile guy, was absolutely meticulous in his work and he even cleaned up after himself at the end of each day. The tile work in this bathroom is absolutely beautiful.

When we had a question, we would call or text Kai and get a response right away.  When Kai would say workers would be here, they were and on time.  All the subcontractors First Finishers work alongside are top notch also from the plumbing contractors to the sheetrock guy.  Another thing that was amazing to us, is at the end of the job, a cleaning lady came and fine cleaned the bathroom from top to bottom.

Just by First Finishers professionalism and timeliness alone, they sold us in wanting to hire them, but their integrity and top quality work will keep us coming back to them for any other projects we need done in the future.”

~ Dave and Roseann Bartlett | Tumwater, WA